Main
Feedback
Map
SK MOST
     
Main
 
 
Overbridge in Ekaterinoslavka village (Amur Region)
Road construction / Overbridge in Ekaterinoslavka village (Amur Region)

Overbridge over Zabaikalskaya Railway in Ekaterinoslavka village in Amur region

Overbridge construction at km 7,945, Picket 8 of the Zabaikalskaya Railway.

Construction commencement ? August, 2008, construction completion ? November, 2010.

The overbridge crosses the railway at an angle of 60?.

Overbridge scheme: 18+3x24+2x18 m, overall dimensions G9 + 2x1.5 m. Overbridge length ? 127.296 m.

End piers are of trestle type having an individual design. Support basement ? 6 bored reinforced concrete piers with diameter of 1.5 m and burial depth of up to 18 m, united pairwise with monolithic head. Support top portion ? prefabricated reinforced concrete pillars with diameter of 0.8 m.

Intermediate supports are of grillageless type, three pole, single row. Base portion ? bored piers with diameter of 1.5 m, footing depth ? up to 20 m. Top portion ? cast-in-place reinforced concrete pillars with diameter of 1.35 m.

Reinforced concrete superstructures with lengths of 18 m and 28 m are of l-shaped cross-section with prestressed reinforcement and incompletely concreted slab. Superstructure cross-section is composed of 6 girders with spacing of 2.3 m between them.

Maurer MMM D-80 expansion joints are arranged between superstructures at support No. 4, superstructures Nos. 1, 7 and abutment walls. Expansion joints shall be arranged along the whole superstructure width.

Road surface is made of bitumen concrete 70 mm thick. A protective coating of steel fiber concrete 100 mm thick functions as a waterproof layer.

Work has been carried out on the main operational railway track of the Trans-Siberian line. Installation of superstructure girders with a length of L=24.0 m has been carried out by ?launching?, with 2-hour stops of train traffic without dismantling the overhead contact system.

? ? ?


View Road construction in a larger map

  • Bridge Crossing to the Russky Island Across the Eastern Bosporus Strait in Vladivostok
  • Sheremetyevo overpass in Moscow
  • Highway bridge in St. Petersburg
  • Road interchange crossing in Tyumen
  • Bypass around Chernyshevskoye village
  • Bridge across the Sura River and railroad in Penza
  • Bridge across the Staraya and Novaya Pregolya Rivers
  • Overpass bridge on the Baikal highway
  • Overpass bridge in Korolev
  • Bridges between 483rd and 539th km of the Amur highway
  • Bridges between the 539th and 596th km of the Amur highway
  • Bridges between the 1143rd and 1183rd km of the Amur highway
  • Vehicle Access from the AMUR motorway to the Town of Kudecha
  • Overbridge in Ekaterinoslavka village (Amur Region)
  • Overpass at Borzya Station
  • Overpass at Macievskaya Station
  • Overpass in the city of Podolsk
  • Circular speedway in Kaliningrad Region (the first phase)
  • Circular speedway in Kaliningrad Region (the fourth phase)
  • 137th - 141st-km section of M-60 "Ussury" Motorway
  • 619th-km section of M-60 "Ussury" Motorway
  • 639th - 664th-km section of M-60 "Ussury" Motorway
  • 747th - 750th-km section of M-60 "Ussury" Motorway
  • Bridge across the Byssa River
  • Overpass over Baikal - Amur Line at the 3081st Kilometer
  • Bridges and Overpasses at the Approach to the City of Svobodny
  • Stay Cable Bridge on Adler - "Alpika-Service" Mountain Resort Route in Sochi
  • Bridge Over the Amurskaya Channel to the Bolshoy Ussuriysky Island
  • Dmitrovskoe Highway Beltway Interchange in Moscow
  • Overpass at the 31st kilometer of Moscow Inner Beltway
  • Berlin Bridge on the southern bypass of Kaliningrad
  • Overpass over the Railway Tracks and Dzerzhinskoe Highway in Moscow Region
  • Highway Bridges on the Adler - AlpikaCombined Route
  • Bridge across the Selemdzha River
  • Railway Track Underpass in Pavlovsky Possad
  • Moscow, Russia
    www.rusmost.ru
    E-mail: usk@skmost.ru
     
    Copyright 2018 SK Most. All rights reserved.