Krolsky railway tunnel
Tunnel construction / Krolsky railway tunnel

Krolsky railway tunnel

Construction of the new Krolsky tunnel on the Abakan ? Taishet section of the Krasnoyarsk railway.

Length of the tunnel ? 2253.6 m.

Scope of work: construction of a new tunnel parallel to the existing one on the high side at a distance of 36 m. Tunnel excavation is performed by means of a LOVAT RME-375 SE, D=9.5 m mechanized shield complex with an earth pressure system.

The new Krolsky Tunnel became the first railroad tunnel in Russia to be excavated by means of a mechanized tunnel-boring complex.

Completion of construction ? 2010.



   



  • Kuznetsovsky railway tunnel
  • Krolsky railway tunnel
  • Mansky railway tunnel
  • Maly Novorossiisky railway tunnel
  • Bolshoy Novorossiysky Tunnel
  • Tunnel System No.1 on Adler - "Alpika-Service" Route in Sochi
  • Railway Tunnel No.2 on Adler - "Alpika-Service" Route in Sochi
  • Tunnel System No.3 on Adler - "Alpika-Service" Route in Sochi
  • Railway Tunnel No. 4 on Adler - "Alpika-Service" Route in Sochi
  • Tunnel System No. 5 on Adler - "Alpika-Service" Route in Sochi
  • Railway Tunnel No. 6 on Adler - "Alpika-Service" Route in Sochi
  • Tunnel at the 86th kilometer of Transkam road
  • Rocksky Motorway Tunnel
  • Obluchensky Railway Tunnel
  • Railway Tunnel Number One on the Northern Caucasus Railway
  • Tomusinsky Railway Tunnel
  • Korshunovsky Railway Tunnel
  • Kiparisovsky Railway Tunnel
  • Baikal Railway Tunnel
  • Second Dzhebsky Railway Tunnel
  • Moscow, Russia
    www.rusmost.ru
    E-mail: usk@skmost.ru
     
    Copyright 2018 SK Most. All rights reserved.