Driving Completed of the Right Intrerstation Tunnel between “Zhulebino” and “Lermontovsky Prospekt” Stations of the Tagansko-Krasnopresnenskaya Moscow Subway Line

Picture Stories

Tunneling was conducted using the Herrenknecht EPB-6340 Tunnel Boring Machine from the station “Zhulebino.” Construction of the tunnel that is 1575 meters long began in January 2013.

Sergej Sysoev / SK MOST

Photo: Aleksandr Golovkov
The SK MOST Group of Companies

Spelling error report

The following text will be sent to our editors: