Picture Stories
Builders Started to Install Bored Piles of a Pier of a New Overpass in Svobodny City
014
An old construction is totally dismantled.
The SK MOST Group of Companies
Picture Stories
Specialists of USK MOST JSC Started To Erect the First Pier’s Body of the New Zeya Bridge on the Left-Bank Construction Site
017
Builders construct the base section of the body of the 23rd pier.
The SK MOST Group of Companies
Picture Stories
Specialists of JSC “USK MOST” completed repair and restoration work on the bridge over the river Zeya in Blagoveshchensk
025
For three "technological Windows" at night, builders replaced four floor slabs that had previously been
The SK MOST Group of Companies
Picture Stories
Specialists of JSC “USK MOST” started repairing the bridge over the Zea
017
Builders will have to replace the floor slabs in three "technological Windows".
The SK MOST Group of Companies
Picture Stories
The first road bridge from Russia to China has received a permit for commissioning
030
Specialists of SK Most Group of companies completed the construction of the Russian part of the bridge crossing.
The SK MOST Group of Companies
Picture Stories
The Serbian President visited the section of the Stara Pazova-Novi Sad railway that is being built by the SK Most Group of Companies
018
Alexander Vucic expressed great gratitude to the builders and said that the result of their work will
The SK MOST Group of Companies
Picture Stories
Work on the upper structure of the track in the new Baikal tunnel is fully completed
016
In April 2019, work on laying the upper structure of the track of the new Baikal tunnel was completed.
The SK MOST Group of Companies
Picture Stories
Drilling of TBM “Victoria” resumed
014
The tunnel was resumed to the Stakhanovskaya station after the cutting tool was replaced.
The SK MOST Group of Companies
Picture Stories
Current status of construction of a bridge over the Don river
013
Construction of a railway bridge over the Don river as of the end of March 2018.
The SK MOST Group of Companies
Picture Stories
STROY-TREST JSC becomes a contractor for the construction of 53 artificial structures on Sakhalin island
012
On the island of Sakhalin, 53 artificial structures will be built, located on the sections Korsakov-arsentievka
The SK MOST Group of Companies