Picture Stories
The section of the tunnel of the Moscow Metro’s Big Circle Line has been driven under Pechatniki operating station
08
Specialists of the SK MOST Group of Companies continue tunneling between Pechatniki and Nagatinsky Zaton
The SK MOST Group of Companies
Picture Stories
Tunneling between the Pechatniki and Nagatinskaya Zaton stations of the the Moscow Metro’s Big Circle Line has begun
010
Tunnel boring machine (TBM) Victoria has to pass 1,692 meters
The SK MOST Group of Companies
Picture Stories
Specialists of SK MOST Group of Сompanies Completed Tunneling Excavation between Tekstilshchiki and Pechatniki Stations of the Moscow Metro’s Big Circle Line
038
TBM Victoria broke through on the 28th of October.
The SK MOST Group of Companies
Picture Stories
Replacement of TBM Victoria’s Cutting Tool Is Completed
04
Tunnelling of Tekstilshchiki-Pechatniki section (Big Circle Line) is in progress.
The SK MOST Group of Companies
Picture Stories
TBM “Victoria” successfully passed the section of the metro tunnel under the railway tracks
012
During the construction of the section "Tekstilschiki" – "Pechatniki" metro statioms, the tunnel-passing
The SK MOST Group of Companies
Picture Stories
TBM “Victoria” got into the Guinness book of records!
06
Guinness World Records recorded in Moscow a world record for the largest number of tunneling complexes
The SK MOST Group of Companies
Picture Stories
Specialists of JSC “USK Most” conducted a unique operation on the descent of the shield “Victoria” in the pit of the metro station
027
For the first time in Russia, a 10-meter shield of the tunneling complex (tpmk) was assembled and moved
The SK MOST Group of Companies
Picture Stories
Dismantling and lifting of the rotor of the shield-giant “Victoria”
06
Comprehensive work is underway to dismantle TBM. The multi-ton rotor was lifted from the pit for further
The SK MOST Group of Companies
Picture Stories
“Victoria” successfully got off at the station “Nizhegorodskaya”
012
The giant tunneling complex Herrenknecht EPB-10690 completed its work precisely and on time.
The SK MOST Group of Companies
Picture Stories
The section of the metro tunnel under the railway tracks of the MZHD was successfully passed
04
During the construction of the tunnel, TBM Victoria overcame a difficult section under the railway tracks
The SK MOST Group of Companies